Implementation of an automated system through CLP processors.
ETE Baleia Sahy
Sabesp
03/15/2010 to 05/14/2013 (3 years and 2 months)
R$ 16.759.418,40
Balneário Barra do Sahy, Balneário Praia da Baleia, São Sebastião (SP)
• STS Flow: 80 l/s • Treatment method: sludge process for wastewater treatment • SPS S1: flow: 5.00 l/s; manometric height: 4 mca • SPS S2: flow: 5.00 l/s; manometric height: 6 mca • SPS S2A: flow: 25.00 l/s; manometric height: 9 mca • SPS Vila Sahy: flow: 5,00 l/s; manometric height: 6 mca • SPS B1: flow: 14,50 l/s; manometric height: 5,5 mca • SPS B2: flow: 41,00 l/s; manometric height: 10,0 mca • SPS B3: flow: 82,00 l/s; manometric height: 24,0 mca
Sanitation